
Africa · the Gulf and wider Middle East · Central Asia · Southeast Asia
Get a free first design in 24 hoursWho we are
Our engineers have commissioned national facilities in Africa, and designed data centres in Africa and Southeast Asia. We start from your site and the power it has. Design and field delivery sit in one team, from the first design to handover.
At a glance
projects in our project record.
countries: Zimbabwe, the Republic of the Congo, Malaysia, the USA and China.
MW capacity range of our data centre designs.
engineers and delivery specialists in our long-standing network, supporting a core design and engineering team.
What we deliver
| 01 Design | 02 Deliver | 03 Commission | |
|---|---|---|---|
| Power and energy | Power plan from the supply the site has; single-line diagram; MV, LV, UPS and generator sizing. | MV and LV distribution, UPS, generators and solar supplied and installed. | Load and failover tests on the full power chain. |
| Cooling | Air, chilled-water or liquid cooling matched to rack density and climate. | Plant, pipework and containment installed. | Cooling tested under load, duty and standby. |
| Data hall and IT | Hall layout, racks, containment and cabling routes. | Racks, cabling and machine rooms built out. | Hall handed over ready for IT. |
| Intelligent building and ELV | Building management (BMS), security and monitoring design. | Extra-low-voltage (ELV) systems installed and integrated. | Alarms and controls tested end to end. |
| Project and site delivery | Phasing and schedule agreed at design lock. | Our project manager leads on site, with a delivery team we build locally. | Test records and handover documents; support after handover. |




Project record
Computing room, integration, commissioning · In operation since 2015
Brazzaville, Rep. of the CongoMachine room, power, cooling, ELV · In delivery
Cyberjaya, MalaysiaData hall and cooling design · Design
Harare, ZimbabwePhase 1 data centre; phase 2 DR centre · Phase 1 commissioned 2021
Other projects
| Project | Site | Scale | Our scope | Status |
|---|---|---|---|---|
| Phased data centre | Harare, Zimbabwe | 5–10 MW | Module layout and machine-room design | Design |
| Existing-building retrofit to data centre | USA | — | Layout and MEP-interface design support | Design |
| Municipal government cloud platform | China | 114 user organisations (2023) | Implementation support: machine room, cloud resources, security, backup and migration | In operation |
| Education campus information systems | China | About 350,000 m²; 4,500 trainees | Installation, commissioning and handover of intelligent systems | Handed over |
| Industrial software park intelligent systems | China | About 265,000 m² | Intelligent-systems hardware and software, installation and commissioning | Handed over |
Case 1 · Harare, Zimbabwe
In operation, under a year after work started.
With 72 TB of storage in phase 1.
From computing-room design to commissioning.



Case 2 · Brazzaville, Republic of the Congo
Works started.
One basement level and three storeys above ground.
In delivery; commissioning is next.
Cases 3 and 4
Case 3 · Cyberjaya, Malaysia
Planned; phase 1 floor area over 20,000 m².

Case 4 · Harare, Zimbabwe
Phase 1 commissioned on 24 February 2021, in a ceremony led by the President of Zimbabwe.


Design · Drawings





Energy efficiency
Energy efficiency · from grid to IT load
We state targets only for a specific site, from its climate, load and power supply.
How we work
What you receive at design lock
Each step starts only when you approve the one before it.
G2MAX stays accountable from first design to handover.
Every step ends in documents that are yours to keep.
Our organisation
90+
engineers and delivery specialists in our long-standing network
Our core team leads design, client engagement and quality control on every project. Delivery is carried out with a network of 90+ engineers and specialists we work with repeatedly, about half technical and half on-site delivery, selected for each project.
The engineers who draw the first design stay with the project to handover.
Leads delivery on site and reports to you at every gate.
Recruited and trained in the project country, working with the right local partners.

Contact
Where it is, and any plan or boundary you already have.
The IT capacity you plan.
The power supply available to the site.
When you want it running.
If you have them: site photos or a map pin, and rack density or whether liquid cooling is needed.
You receive
24 hours
FREEA first design within 24 hours: block plan and power estimate.
5 working days
FREEWant to continue? We send a short checklist, and a proposal follows within 5 working days.